OFFSHORE PHOTOS 01B-36 inch @ Pipe Support Location
02A-Before -30 inch with 12 inch Hot Tap
02B-After-30 inch with 12 inch Hot Tap
03-8 inch with 2 Bends & 3 Tees
04A-20 inch Corrosion at Weld
04B-20 inch-Putty applied to all void areas
04C-20 inch-18 Wraps of AP
05-6 inch AP Installation
06-10 inch @ Penetration Deck
07-6 inch AP Installation
08-2 of 6 inch Installations under Skid
09-10 inch with various number of wraps
10-12 inch AP Installation
11-16 inch Dock Piles with AP360UW
12-6 inch with Bends
![]() 13-6 inch
14-Tee
15A-4 inch before
15B-4 inch after
16-12 inch with Flange
17-Glycol Reboiler with AP360HT
18-Nozzle
19-4 inch with Branch
20-12 inch - Pipe Support
21-6 inch Riser
22-12 inch Riser
23-6 inch with Pipe Support Location
|
||||||||||||||||||||||