OFFSHORE PHOTOS


01A-36 inch @ Pipe Support Location


01B-36 inch @ Pipe Support Location


02A-Before -30 inch with 12 inch Hot Tap


02B-After-30 inch with 12 inch Hot Tap


03-8 inch with 2 Bends & 3 Tees


04A-20 inch Corrosion at Weld


04B-20 inch-Putty applied to all void areas


04C-20 inch-18 Wraps of AP


05-6 inch AP Installation


06-10 inch @ Penetration Deck


07-6 inch AP Installation


08-2 of 6 inch Installations under Skid


09-10 inch with various number of wraps


10-12 inch AP Installation


11-16 inch Dock Piles with AP360UW


12-6 inch with Bends


13-6 inch


14-Tee


15A-4 inch before


15B-4 inch after


16-12 inch with Flange


17-Glycol Reboiler with AP360HT


18-Nozzle


19-4 inch with Branch


20-12 inch - Pipe Support


21-6 inch Riser


22-12 inch Riser


23-6 inch with Pipe Support Location


 
 
 
 
All Content © 2010, Armor Plate, Inc. All Rights Reserved.
Website Development and Hosting provided by Tanner Creative