CONROE, TEXAS INSTALLATION
Armor Plate® Pipe Wrap was used to repair several corroded riser pipes that possessed corrosion at the air/soil interface. The soil was excavated around the pipes and the repair was installed.

Excavation of pipeline prior to repair. As may been seen, the pipe surface has been cleaned using a hand-held grinder.

The pipe surface is cleaned prior to installation to remove any possible surface contaminants.

Installation of epoxy primer prior to installation of the fiberglass cloth.

The completed repair.

Repair of a corroded section of pipe adjacent to an elbow. The repair system can be used to repair almost any pipe geometry.

Close-up photograph of repair being installed on a riser pipe.

 
 
 
 