About Us
“Some people succeed because they are destined to, but most succeed because they are determined”.
Recognizing the potential for developing a pipe repair method using composite materials, Armor Plate, Inc. started an extensive testing program in the fall of 1997. The intent of this research program was to ensure that the Armor Plate® Pipe Wrap system would adequately meet the repair needs of the oil and gas industry. Stress Engineering Services, Inc. of The intent of the test program was to evaluate the structural integrity of the system in terms of composite materials and interaction with various piping geometries. An imperative in the evaluation was that testing must simulate field conditions and possesses representative loads common to pipeline systems. By the early summer of 1998 it was apparent that Armor Plate, Inc. had developed a system that could repair any number of pipeline anomalies involving practically any pipeline geometry. In July of 1998, Fred Wilson, president of Wil-Cor, Inc. and Armor Plate, Inc., and Chris Alexander, an engineering consultant with Stress Engineering Services, Inc., made a presentation to the Office of Pipeline Safety (OPS) about Armor Plate® Pipe Wrap. The former head of Office of Pipeline Safety (“OPS”), Joe Caldwell, was instrumental in setting up this meeting. The outcome of the meeting was two-fold. For Armor Plate, Inc. it served as encouragement to continue research and development and OPS was encouraging innovative technologies, such as composite materials. For the Office of Pipeline Safety, it was confirmation that organizations like Armor Plate, Inc., along with pipeline companies, were anxious to see some type of ruling. Although it would take time for this ruling to take effect, by January of 2000 the OPS had made their ruling and Armor Plate® Pipe Wrap was mentioned prominently throughout the document. In 2008, Armor Plate, Inc. had tests performed on wrinkle bend repair. Using some of the insights extracted from a prior wrinkle bend study, Stress Engineering Services, Inc. and El Paso Corporation developed a program to specifically assess the performance of wrinkle bends as a result of vintage construction on a vintage pipeline. Again, Armor Plate® Pipe Wrap solved the problem and saved the expense of shutting down and replacing the area with new pipe. The greatest growth in the business operation for Armor Plate, Inc. took place in 2000. Numerous world-wide installations were made in regions such as Armor Plate, Inc. has committed to on-going test programs to further serve our customers. |
||||||||||||||||||||||